图片名称

Wireless | International Certification Update - September

Author.

LCS

Source:

Post time:

2025-09-30

Africa:

1. Guinea Bissau ARN

On August 5, 2025, the National Information and Communication Technology Regulatory Authority (ARN) issued Order No. 4/CA/ARN/2025, aimed at regulating the designation of local representatives for the certification of information and communication technology (ICT) equipment to be sold in Guinea Bissau. This command stipulates that all domestic or foreign entities wishing to obtain equipment approval certificates from ARN must mandate the appointment of a local representative residing in Guinea Bissau, who has the authority to act on behalf of the applying entity.

 

main points:

Guinea Bissau has the qualifications and mandatory local representatives of its residents;

Representatives can be represented by natural persons or legal entities, with headquarters and effective NIF;

The designation must be formally confirmed through an authorization letter or notarized statement.

The local representative will be responsible for:

Communicate with NRA; Responding to information and testing requests; Ensure the technical and after-sales responsibilities of the equipment; Maintain the latest data with NRA.

Deadline: Entities undergoing approval procedures on the effective date of the command have 60 days to regulate their situation, otherwise they will be subject to penalties in the archiving process.

Effective date: August 4, 2025 (publication date).

 

2. Nigeria NCC

On August 6, 2025, the Nigerian Communications Commission (NCC) released regulatory guidelines on its website regarding the use of the lower portion of the 6GHz frequency band (5925-6425MHz) for license free applications in Nigeria. The guide defines two power levels of products:

23dBm LPI category, only used for indoor environments;

The VLP category of 14dBm can be used in indoor or outdoor environments.

 

 

Asia:

 

1. NTA Nepal

On September 8-9, 2025, Nepal experienced a large-scale protest led by youth, widely known as the Generation Z Revolution. The demonstration calls for an end to corruption and the lifting of social media bans. During the riots, multiple government offices were damaged and attacked, resulting in the closure of many national buildings, including the Nepal Telecommunications Authority (NTA). Therefore, regulatory functions such as type certification may face delays until the office reopens and resumes normal operations.

Media Center

Latest News

Contact Us

图片名称
图片名称

National 24-hour service hotline

400-116-2629

Group Headquarters

Cell phone:18126505465

E-mail: webmaster@lcs-cert.com

Address: Shenzhen City, Baoan District, Shajing Street, Nga side of the school of Wei Juji Industrial Park, Building A 1 ~ 2 floor, Building C 3 floor