External line tension/torque

According to different rated values, use different test parameters to test the effectiveness of the external wire crimping device. For example, for a specification of 2x0.75mm2, use 60N to pull 25 times and twist 0.15Nm for parameter testing.

 

External line tension/torque testing is a key test to evaluate the effectiveness of power line crimping devices, with the aim of ensuring that power lines do not loosen or fall off when subjected to tension and torque, thereby ensuring the reliability and safety of electrical connections. The following are the testing steps and parameter settings for different specifications of power cords:

 

1. Testing standards
External line tension/torque testing is usually based on the following standards:

IEC 60335-1: General safety requirements for household and similar electrical appliances.

IEC 60884-1: Standard for plugs and sockets for household and similar purposes.

UL 817: Standard for power cords and plugs (applicable to the North American market).

GB 2099.1: Standard for plugs and sockets in China.

 

2. Testing equipment
Tensile testing machine: a device capable of applying a specified tensile force.

Torque testing machine: a device capable of applying a specified torque.

Fixture: used to fix power cords and crimping devices.

 

3. Test parameters
According to the specifications and standard requirements of the power cord, the testing parameters may vary. Taking the 2x0.75mm ² specification as an example:

tensile test:

Tensile strength: 60N

Number of times: 25 times

Direction: Apply tension along the power cord.

Torque test:

Torque: 0.15Nm

Direction: Apply torque alternately clockwise and counterclockwise.

 

4. Testing steps
tensile test
Sample preparation:

Select power cord samples that meet the specifications (such as 2x0.75mm ²).

Ensure that the crimping device is installed correctly.

Installation sample:

Fix the power cord onto the tensile testing machine.

Ensure that the crimping device is in normal working condition.

Set parameters:

Set the tension to 60N and test 25 times.

Start testing:

Start the tensile testing machine and apply a tensile force of 60N along the power cord for 25 consecutive times.

Monitoring test:

Observe whether the power cord and crimping device are loose, detached, or damaged.

 

Torque Test
Sample preparation:

Use the same power cord sample.

Ensure that the crimping device is installed correctly.

Installation sample:

Fix the power cord onto the torque testing machine.

Ensure that the crimping device is in normal working condition.

Set parameters:

Set the torque to 0.15Nm and test in alternating clockwise and counterclockwise directions.

Start testing:

Start the torque testing machine and apply a torque of 0.15Nm alternately.

Monitoring test:

Observe whether the power cord and crimping device are loose, detached, or damaged.

 

5. Post test evaluation
Appearance inspection

Check if the outer skin of the power cord is damaged.

Check if the crimping device is loose or detached.

Electrical performance testing:

Measure the conductivity of the power cord to ensure that the wire is not broken.

Conduct insulation resistance testing to ensure that the outer skin is not damaged, which may lead to a decrease in insulation performance.

Mechanical performance testing:

Check the fixing condition of the crimping device to ensure that it is not loose or deformed.

 

6. Judgment criteria
By standard:

The outer shell of the power cord is undamaged.

The crimping device is not loose or detached.

The wire is not broken and has good conductivity.

The insulation resistance meets the standard requirements.

Failed to meet the standard:

The outer skin of the power cord is damaged or the wire is broken.

The crimping device is loose or detached.

The insulation resistance does not meet the standard.

 

7. Improvement measures
Optimization of wire pressing device:

Improve the design of the pressure line device and enhance its fixing ability.

Choose more durable materials to improve the strength of the crimping device.

Process improvement:

Improve the installation process of the crimping device to ensure its firmness.

Strengthen the connection process between the power cord and the crimping device to prevent loosening.

 

8. Compliant with standards
International standards: Ensure that testing methods and evaluation standards comply with IEC or UL standards.

Certification requirements: Ensure that the product meets relevant certification requirements (such as CE, UL, CCC, etc.) based on the target market.

Through the above steps, the effectiveness of the power line crimping device can be comprehensively evaluated, ensuring its reliability and safety under tension and torque.