图片名称

Solutions

Contact Us

图片名称
图片名称

National 24-hour service hotline

400-116-2629

Group Headquarters

Cell phone:18126505465

E-mail: webmaster@lcs-cert.com

Address: Shenzhen City, Baoan District, Shajing Street, Nga side of the school of Wei Juji Industrial Park, Building A 1 ~ 2 floor, Building C 3 floor

Bent power cord

Test the strength and flexibility of the external wire frame.

The power cord bending test is an important test to evaluate the strength and flexibility of the power cord and its wire frame (such as external wire frame), with the aim of ensuring that the power cord can withstand repeated bending without damage during long-term use. The following are the testing steps and evaluation points:

 

1. Testing standards
The power cord bending test is usually based on the following standards:

IEC 60884-1: Standard for plugs and sockets for household and similar purposes.

IEC 60335-1: General safety requirements for household and similar electrical appliances.

UL 817: Standard for power cords and plugs (applicable to the North American market).

GB 2099.1: Standard for plugs and sockets in China.

 

2. Testing equipment
Bending testing machine: a device that can simulate repeated bending of power cords.

Load weight: used to apply a specified tensile force.

Counter: records the number of bends.

 

3. Testing conditions
Bending angle: usually 90 ° or 180 ° (according to standard requirements).

Bending speed: usually 10-20 times/minute.

Load weight: According to the specifications and standard requirements of the power cord, it is usually 0.25kg~2.5kg.

Bending frequency: usually 5000~25000 times (according to standard requirements).

 

4. Testing steps
Sample preparation:

Select representative power cord samples.

Ensure that the power cord is securely connected and the wire rack is installed correctly.

Installation sample:

Fix the power cord onto the bending testing machine.

Hang the specified load weight at the end of the power cord.

Set parameters:

Set the bending angle, speed, and number of times.

Start testing:

Start the bending test machine and repeatedly bend the power cord under the set conditions.

Monitoring test:

Regularly check the power cord for signs of damage, such as breakage, damaged outer skin, loose wire frame, etc.

 

5. Post test evaluation
Appearance inspection

Check for cracks, wear, or breakage on the outer skin of the power cord.

Check if the wire frame is loose or deformed.

Electrical performance testing:

Measure the conductivity of the power cord to ensure that the wire is not broken.

Conduct insulation resistance testing to ensure that the outer skin is not damaged, which may lead to a decrease in insulation performance.

Mechanical performance testing:

Check the fixing condition of the wire frame to ensure that it is not loose or detached.

 

6. Judgment criteria
By standard:

The outer shell of the power cord is free of cracks, wear, or breakage.

The wire is not broken and has good conductivity.

The wire frame is not loose or deformed.

The insulation resistance meets the standard requirements.

Failed to meet the standard:

The outer skin of the power cord is damaged or the wire is broken.

The wire frame is loose or detached.

The insulation resistance does not meet the standard.

 

7. Improvement measures
Material optimization:

Choose a more flexible and wear-resistant outer skin material.

Use high-strength wire frame materials.

Design improvement:

Optimize the structure of the wire frame and enhance its fixing ability.

Add protective design for bent parts of power cords.

Process improvement:

Improve the connection process between the power cord and the wire frame to ensure firmness.

Strengthen the bonding process between the outer skin and the wire to prevent cracking of the outer skin.

 

8. Compliant with standards
International standards: Ensure that testing methods and evaluation standards comply with IEC or UL standards.

Certification requirements: Ensure that the product meets relevant certification requirements (such as CE, UL, CCC, etc.) based on the target market.

Through the above steps, the robustness and flexibility of the power cord and its wire frame can be comprehensively evaluated, ensuring their reliability and safety in long-term use.

6 individual

Large-scale experimental base

150 individual

Professional Lab

30 All kinds of

Analysis Method

8 million times

Testing/year