图片名称

Services

返回

Testing Services

Certification Services

Register for the record

Systems and Training Services

Laboratory design and construction

Contact Us

图片名称
图片名称

National 24-hour service hotline

400-116-2629

Group Headquarters

Cell phone:18126505465

E-mail: webmaster@lcs-cert.com

Address: Shenzhen City, Baoan District, Shajing Street, Nga side of the school of Wei Juji Industrial Park, Building A 1 ~ 2 floor, Building C 3 floor

EMI Testing - Transient Conducted Emissions Testing System

  Testing capability:

Fast pulse, slow pulse

Test method:

 DCC,ICC,CCC  

Conform to standards:

GBT 21437, ISO 7637, and various enterprise standards

 

Transient conducted emission testing is a crucial test to assess the level of undesired electromagnetic energy conducted emission caused by transient events such as sudden load changes and switching actions on power or signal lines in electronic devices. The following are the core points:

 

1. Test definition and purpose

Definition: Evaluate the level of undesired electromagnetic energy conducted emission induced by transient events such as sudden load changes and switching actions on the power or signal lines of the vehicle's electronic control unit (ECU).
Objective: To ensure that the on-board electronic system does not interfere with other devices due to its own emissions in a complex electromagnetic environment, meet the basic requirements of electromagnetic compatibility (EMC), and safeguard driving safety and system reliability.

 

2. Applicable standard system

International Standard: Conducted emission testing is conducted in accordance with CISPR 25 (5th edition, 2021), covering a frequency range from 150 kHz to 108 MHz. The artificial mains network (LISN) is used to collect the disturbance voltage on the power line, with limits set according to equipment classes (Class 3~5).
Chinese standards: Equivalent adoption of international standards, primarily based on GB/T 21437.2-2021 "Road vehicles - Test methods for electrical disturbances from conduction and coupling to electrical/electronic components - Part 2: Electrical transient conduction emission and immunity along supply lines", which clarifies the measurement methods and boundary conditions for transient emission; GB 34660-2017, as a mandatory EMC standard for complete vehicles, covers conduction emission requirements, and its revised version (GB 34660-202X) has not changed the core testing methods for conduction emission.

 

3. Test Configuration and Method

Test environment: The test is conducted in an anechoic chamber or shielded room, with the device under test (DUT) placed on a non-conductive platform at a height of (50 ± 5) mm.
Test setup: The power line is connected to the EMI receiver through an LISN, and the signal line is collected using a voltage/current probe.
Test mode: Includes static and dynamic operating conditions, recording the maximum emission level.
Key equipment: LISN, EMI receiver, oscilloscope, transient generator (for immunity testing).

 

4. Common reasons for non-conformity

Inadequate design of power supply filtering circuit: such as improper selection of common mode/differential mode capacitors.
The harmonic of the switching frequency of the DC-DC converter is not effectively suppressed.
The impedance of the grounding path is too high or the grounding loop forms a closed circuit.
The shielding layer of the wire harness is not lapped 360° or the shielding layer is broken.
The transient suppression components (such as TVS and varistors) inside the ECU fail or are arranged inappropriately.

 

5. Basis for Judgment and Compliance

Basis for judgment: The test results are based on the quasi-peak (QP) or average value (AV) measured by the EMI receiver, which are compared with the limits specified in CISPR 25 or GB/T 21437.2.
Compliance: If any frequency point exceeds the standard, it is deemed non-compliant.
Test report: It should include the testing environment, equipment model, calibration certificate number, test curve graph, and conclusion, and be issued by a third-party testing agency with CNAS qualification.

 

6. Testing Process

Preparation stage: Install the device under test (DUT) in an anechoic chamber or shielded room, and connect power cables, sensor cables, etc.
Test execution: Collect the disturbance voltage on the power line through LISN and record the maximum emission level.
Performance criterion: The test results must meet the limits specified in CISPR 25 or GB/T 21437.2.

 

7. Testing Equipment and Environment

Equipment: LISN, EMI receiver, oscilloscope, transient generator (for immunity testing).
Environment: Anechoic chamber or shielded room, isolated from external electromagnetic interference.

 

8. Typical Applications and Rectifications

Vehicle navigation system: Optimize the power supply filtering circuit and add a common mode filter.
ECU module: Enhance signal line shielding and wrap sensitive components with anti-magnetic materials.

 

Summary: Transient conducted emission testing is a crucial step to ensure the stable operation of in-vehicle electronic systems in complex electromagnetic environments. It is necessary to strictly adhere to international and national standards, and make adjustments and optimizations based on actual application scenarios.

  

30 individual

Large-scale experimental base

150 individual

Professional Lab

30 All kinds of

Analysis Method

2700 million times

Testing/year