throw load

Simulate the transient caused by the occurrence of load shedding phenomenon (see Appendix A for the reasons). At the same time as disconnecting the battery, the AC motor is generating charging current, while there are still other transients generated during load shedding on its circuit. Further determine whether the functional status of the sample meets the design requirements.

Objective of the experiment
The purpose of this experiment is to simulate the load dump phenomenon that occurs in the vehicle electrical system, and to test the tolerance and functional status of the equipment under transient load dump conditions. Through experiments, evaluate the performance of the equipment under transient load shedding, ensure that it meets design requirements, and verify the effectiveness of its protection mechanism.

Experimental Background
Load shedding is a common transient phenomenon in vehicle electrical systems, typically occurring in the following situations:

Sudden disconnection of battery connection (such as loose battery wiring or blown fuse).

The AC generator is still running and supplying power to the electrical system.

There are high current loads in the electrical system, such as motors, lights, etc.

Transient load shedding can generate high voltage pulses (usually up to tens or even hundreds of volts), which may cause damage to electrical equipment. Therefore, vehicle electrical equipment needs to have sufficient anti throwing load capacity.

Experimental equipment
Device under Test (DUT): Electrical equipment or system that needs to be tested.

DC power supply: Simulate vehicle battery (usually 12V or 24V).

AC generator simulator: Simulate the output of an AC generator.

Load shedding simulator: used to simulate load shedding transients.

Transient voltage generator: generates transient pulses for load rejection.

Oscilloscope: Monitor the voltage and current waveforms of transient load shedding.

Ammeter: measures the current under transient load shedding.

Voltage meter: monitors the voltage amplitude of transient load shedding.

Load simulator: Simulate other loads in an electrical system.

Experimental Procedure
Device connection:

Connect the DUT to a DC power supply and an AC generator simulator.

Connect an ammeter in series and a voltmeter in parallel in a circuit to monitor current and voltage.

Connect the load simulator to simulate other loads in the electrical system.

Connect the load shedding simulator and transient voltage generator to simulate load shedding transients.

Initial testing:

Under normal operating conditions, record the working status of the DUT, including voltage, current, and functional performance.

Transient simulation of load shedding:

Use a load shedding simulator to simulate the situation where the battery suddenly disconnects.

Use a transient voltage generator to generate transient pulses for load shedding (usually ranging from tens of volts to hundreds of volts, lasting for several hundred milliseconds).

Record the voltage and current waveforms during transient load shedding.

Record data:

Record the voltage, current, and operating status of the DUT during transient load shedding.

Observe whether there are any abnormalities in the DUT, such as functional failure, damage, etc.

Protection mechanism verification:

If the DUT has a load rejection protection mechanism (such as TVS diode, voltage regulator circuit), verify whether it works properly under load rejection transients.

Record the action of the protective device (such as whether the TVS diode is conducting).

Recovery testing:

Restore normal power connection and check if the DUT can resume normal operation.

Record the working status of DUT after restoring normal connection.

Data analysis:

Compare the test data under normal operating conditions and transient load conditions, and analyze the performance of DUT under transient load conditions.

Evaluate whether the load rejection protection mechanism of DUT is effective.

Experimental precautions
safety first:

Transient load shedding may generate high voltage, and protective measures should be taken to avoid electric shock or equipment damage.

Ensure good ventilation in the experimental environment to avoid equipment overheating and causing fires.

Gradually increase the voltage:

When simulating transient load shedding, the voltage should be gradually increased to avoid equipment damage caused by transient high voltage.

Real-time monitoring

During the experiment, real-time monitoring of voltage, current, and equipment status is required to promptly detect any abnormalities.

Protector:

If the DUT does not have built-in load rejection protection, it is recommended to add external protection devices (such as TVS diodes) in the experiment to prevent equipment damage.

Experimental results and conclusions
Experimental results:

Record the performance of DUT under transient load shedding, including whether it is damaged and whether the protective device is activated.

Record the working status of DUT after restoring normal connection.

Conclusion:

Evaluate the tolerance of DUT under transient load conditions and the effectiveness of protection mechanisms.

If the DUT is damaged, analyze the cause of the damage and provide improvement suggestions.

If the DUT has an effective load rejection protection mechanism, confirm that it meets the design requirements.

experiment report
The experimental report should include the following contents:

Experimental objective: Briefly describe the objectives of the experiment.

Experimental equipment: List all the equipment used and their specifications.

Experimental steps: Detailed description of the experimental operation process.

Experimental data: Record all test data, including charts and waveforms.

Data analysis: Analyze experimental data to draw conclusions.

Conclusion and Suggestions: Summarize the experimental results and propose improvement suggestions.

Appendix A: Causes of Load Throwing Phenomenon
The phenomenon of load shedding is usually caused by the following reasons:

Sudden disconnection of battery connection:

Loose or corroded battery wiring.

The battery fuse is blown.

The AC generator is still running:

The AC generator continues to supply power to the electrical system, resulting in an increase in voltage.

There are high current loads in the electrical system:

The sudden disconnection of a high current load causes a transient increase in voltage.

Through this experiment, the safety and reliability of the equipment under transient load conditions can be verified, ensuring its normal operation or effective protection in the vehicle electrical system.