图片名称

Information | Interpretation of ANSI/IES LM-79-24 Standard

Author.

LCS

Source:

Post time:

2026-10-27

The ANSI/IES LM-79 standard is jointly published by ANSI and IESNA. The previous version was ANSI/IES LM-79-19, and after more than 5 years, the latest version of the LM-79 standard has been released: ANSI/IES LM-79-24.


The main changes in the 2024 and 2019 versions of LM-79 are as follows:

1. Normative references reference standards have been updated;


 

2. The concept of photometric center beam center has been added to the definition, photometric center:The point in a light source from which the inverse-square law operates most closely in the direction of maxi-mum intensity;


 

3. The capacitance value of the test circuit needs to change from ≤ 1.5 nF to ≤ 2.0 nF;


 

4. The requirement for the collection order of total harmonic distortion has changed. The requirement for the harmonic collection order of 1 MHz instruments to be at least 2 to 100 has been removed, and only the harmonic collection order of all instruments is required to be 2 to 50;


 

5. Added explanation of the testing principle of Integrated Angular Measurements for light flux distribution;


 

6. Deleted the content descriptions of Airflow Considerations For Testing SSL Products and Power Supply Resistance And Induction Interval in Appendix Annex.

Products covered by the standard:


 

LED lighting fixtures, integrated LED bulbs, integrated OLED bulbs, externally driven non integrated LED bulbs (externally driven according to the definition of ANSI standard circuits or specified by the manufacturer), and LED light engines.


Products not included in the standard:

1. SSL products that require an external heat sink;


 

2. Components of SSL products, such as LED packages or LED arrays;


 

3. A casing or luminaire designed as an SSL product but sold without providing a light source (usually measured using relative photometry).


LM-79 is mainly a testing method that does not determine whether it is qualified or not. The main testing parameters include:

Total luminous flux (lm), luminous efficiency (lm/W), light intensity distribution, chromaticity coordinates, correlated color temperature (CCT), color rendering index (CRI), beam angle, light distribution curve, BURG, BUG and other parameters.


 

Electrical parameters:


 

RMS AC voltage, RMS AC current, AC active power, power factor, total harmonic current distortion, voltage frequency, DC voltage, DC current, DC power.


 

At present, according to the LM-79-24 standard, our laboratory has obtained the ISO/IEC 17025 accreditation qualification from A2LA (American Association for Accreditation of Laboratories), which is a contracted accreditation body for the ILAC MRA international mutual recognition agreement.


 

The LM-79 testing standard, as a fundamental and important testing standard in the SSL lighting industry, has a significant impact on the entire SSL lighting industry. Energy Efficiency certifications in various countries use it as a reference standard for testing, such as Energystar, DOE, CEC, and DLC certifications in the United States; Darksky authentication; VEET and IPART certifications from Australia; Brazil's new regulation No. 231/2026 certification; Abu Dhabi ADQCC certification; Colombia RETILAP and so on.

Media Center

Latest News

Contact Us

图片名称
图片名称

National 24-hour service hotline

400-116-2629

Group Headquarters

Cell phone:18126505465

E-mail: webmaster@lcs-cert.com

Address: Shenzhen City, Baoan District, Shajing Street, Nga side of the school of Wei Juji Industrial Park, Building A 1 ~ 2 floor, Building C 3 floor