图片名称

Key points overview | Philippines will implement new mandatory certification for mobile power banks and portable power banks

Author.

LCS

Source:

Post time:

2026-05-11

Part.1

background

 

The mandatory certification system for mobile power banks and portable power banks proposed by the Philippines will become the threshold for entering the Philippine market. The relevant information comes from the notifications submitted by DTI and BPS of the Philippines to the WTO.

 

The evaluation period ends on April 26, 2026, and the proposed approval date is June 30, 2026. The formal implementation will be based on the format officially announced by the Philippines, and usually takes effect after a few days of national announcement. It is expected that there will be a transition period of about 12 months during which the company will need to complete adjustments, and the full implementation will be around mid-2027.

 

Part.2

Industry Status and Impact

 

The demand for imported mobile power banks in the Philippine market is strong, with a large proportion of imports, most of which come from China. The new regulations will directly affect existing import channels and compliance costs.

 

The new regulations apply to mobile power banks, portable power banks, photovoltaic integrated products, and built-in energy storage devices. The applicable product types are relatively comprehensive, and confirmation testing is also required for exceeding parameters.

 

Part.3

Core authentication framework

 

1、 PS certification (preference for long-term export, suitable for large quantities)

Applicant: The application is made separately by the factory or production base, and overseas manufacturing requires the establishment of a legal agency in the Philippines to handle it.

Scope of application: When producing multiple varieties in the same factory, applications must be submitted separately according to product categories.

Certificate binding: Each PS certificate corresponds to only one local importer. If multiple importers are involved, separate applications must be made.

Submission materials: including notarized forms, registration and financial information, quality manual, process description, testing equipment list, label samples, battery cell related reports, etc.

Validity and supervision: The certificate is valid for 3 years and requires annual factory audits and market inspections during this period; After arrival, on-site verification will be conducted to confirm consistency and issue a conformity statement SOC.

Customs clearance support: After obtaining the PS, relevant customs clearance needs to be submitted batch by batch according to the documents and cooperate with on-site verification.

 

2、 ICC certification (as an emergency alternative, suitable for small batch or temporary imports)

Applicant: Only entities legally registered within the Philippines (local importers) are required to provide registration certificates such as DTI/SEC.

Submission process: Complete material list, packing list, invoice, bill of lading, batch information, dealer list, storage certificate, and guarantee must be submitted.

Sampling and Testing: Randomly sample two sets of each model/brand for testing, and after passing the test, BPS will issue an ICC certificate; If it is not qualified, the enterprise can choose to retest, rectify or return/destroy it.

Conditional Release: A conditional release certificate can be obtained when all necessary documents are available, which is valid for the current shipment.

 

Part.4

Key points for enterprise response

 

Classification recognition: First confirm whether your own product is included in the scope of application, and choose the PS or ICC path according to the situation.

Data preparation: Prepare corresponding documents according to the certification category; For overseas enterprises, it is necessary to establish a local entity or designate an agent in the Philippines as soon as possible to ensure the smooth submission of PS applications.

Process docking: For long-term exports, prioritize promoting PS certification and completing factory audits; For temporary imports, ICC shall be selected and customs clearance shall be handled by batch. Products that have obtained PS certification need to apply for SOC in batches to complete the customs clearance process.

Compliance retention: Establish and improve certificates, testing reports, customs clearance documents, and other records for market sampling and filing verification.

 

Part.5

Risk statement

 

The consequences of violations are severe, including suspension of production, mandatory recall, fines, retention of deposits, and even being blacklisted; When it comes to risks such as label errors and the circulation of unverified products, there may be stricter enforcement and market restrictions.

Transportation and customs clearance risks: Failure to submit SOC/ICC and other documents as required may result in customs clearance delays or even the return or destruction of goods.

 

Part.6

Cost and label requirements

 

Certification fee: Classified by enterprise size and value, including PS/ICC application fee and quality manual review fee, etc; In some cases, there may be additional processing fees.

Guarantee and deposit: Single ticket guarantee deposit is usually charged at a certain amount or proportion of the value of the goods, and may be confiscated in case of violation.

Product identification: The mobile power bank should clearly indicate the manufacturer, model, input and output parameters, rated capacity, safety instructions, certification mark, and license number on the body, tag, and packaging.

 

Part.7

Key points of the schedule

 

Effective after the publication of regulations: There is usually a fixed effective window after the announcement is published.

Evaluation stage: a time period during which stakeholders are allowed to provide their opinions.

Transition period: usually around one year, providing a buffer period for enterprise adaptation.

Mandatory enforcement: After the transition period ends, all products entering the market must have PS, SOC, or ICC certification before they can be circulated.

Comprehensive implementation: The supervision of products entering the market that follow the certification path will be further strengthened.

Media Center

Latest News

Contact Us

图片名称
图片名称

National 24-hour service hotline

400-116-2629

Group Headquarters

Cell phone:18126505465

E-mail: webmaster@lcs-cert.com

Address: Shenzhen City, Baoan District, Shajing Street, Nga side of the school of Wei Juji Industrial Park, Building A 1 ~ 2 floor, Building C 3 floor